Search options

Search operator:
Find:
At least one word (OR)
All words (AND)
Exact expression (Phrase)
Semantic search & fuzzy search
Also find:


2021-07-30T15:43:04Z
Republic of Ethiopia (2003) EPA Guideline series documents for reviewing environmental impact study reports.pdf
user:

Republic of Ethiopia (2003) EPA Guideline series documents for reviewing environmental impact study reports


THE FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA
ENVIRONMENTL PROTECTION AUTHORITY

GUIDELINE SERIES DOCUMENTS FOR REVIEWING
ENVIRONMENTAL IMPACT STUDY REPORTS


NOT FOR CITATION

This guidelines is still under development and shall be
binding after consensus is reached between the
Environmental Protection Authority and the Environmental
Units of Competent Sectoral Agencies

____________________________

ADDIS ABABA
JANUARY, 2003


PREFACE

In Ethiopia so far there is no systematic approach in reviewing environmental impact
study reports. Past experience has shown that reviews of Environmental Impact Study
(EIS) reports were mainly based on individuals' experiences and opinions.

In order to overcome this constraint and make review of reports to the standard, EPA has
prepared these four Guideline series Documents with the objectives of:

 providing a consistent approach for reviewing EIS reports;
 deciding whether there is sufficient information on the background of the

project and its environmental setting, alternatives, impacts, mitigation and
monitoring;

 ensuring that all relevant information has been analyzed and presented
based on appropriate methodologies;

 ensuring the points of view of all stakeholders have been taken into account;
 guiding the reviewing process and facilitating decision making;
 indicating a comprehensive information requirements;
 evaluating the reports in a systematic and objective manner; and
 providing a structured questionnaires for interpreting the information that

will be provided in the report.

These guideline documents are intended to serve as basis for guidance in reviewing of
environmental impact study reports pertaining to projects of all sectors. These
documents are:

REVIEW GUIDELINE SERIES 1: Guidelines for Review Approach
REVIEW GUIDELINE SERIES 2: Guidelines for Contents and

Scopes of Report
REVIEW GUIDELINE SERIES 3: Checklist of Environmental

Characteristics
REVIEW GUIDELINE SERIES 4: Review Criteria

The guideline documents, although mainly meant to be used by EPA and relevant
regional environmental agencies, they can also be used by sectoral environmental units,
and the proponents.

Thus the guideline documents will help to make decision in good time and faith, whether
and under what conditions a project should be allowed to proceed.


REVIEW GUIDELINE SERIES


Guidelines for Review
Approach


Table of Contents

page

1. INTRODUCTION........................................................................................................1

2. APPROCHS TO BE FOLLOWED DURING THE REVIEW PROCESS..............1

2.1. Competent Authorities Review.................................................................................1

2.2. Specialist Review.....................................................................................................1

3. AIDS TO ASSIST THE REVIEW PROCESS..........................................................1

3.1. Checklists for Evaluating the Report.......................................................................2

3.2. Guideline for the Contents and Scopes of the Report.............................................2

3.3. Site Visits................................................................................................................2

4. REGARDING ADEQUACY OF THE REPORT....................................................2

4.1. Identifying Effective EIA.........................................................................................2

4.2. A Framework (structured Questionnaire) for Review...........................................3

4.3 Format for Compiling the Review Comments......................................................4


1. INTRODUCTION

This section raises a number of fundamental issues with regard to how Competent
Authorities review environmental impact study reports, the approaches to be followed
in reviewing the reports, a structured questionnaire (checklist) for interpreting the
information as well as background information of the suggested review criteria
(format) for compiling the review comments.


2. APPROCHES TO BE FOLLOWED DURING THE REVIEW

PROCESS


EIS reports of major development projects that are subject to licensing, execution, or
supervision by federal agency or when they are likely to produce trans-regional
impacts should be reviewed for their adequacy by the EPA. At the regional level,
the regional environmental agency is mandated in reviewing EIS reports of those
development projects that are not under the jurisdiction of the EPA.

2.1. Competent Authorities Review

 Impact Assessment Service (IAS) of the Authority or its equivalent focal unit of
the relevant regional environmental agency coordinates the review works
(activities) of the staff of the various other functional units of their respective
institutions.

 The same focal units mentioned above will undertake analysis and compilation of
the reviews of the various functional units of the institutions.

2.2. Specialist Review

This form of review is pertinent to controversial development proposals or where
there is public concern and/or uncertainty over specific issues. In this respect,
therefore the following proposals should be considered for specialist review:

 highly technical proposals;
 proposals for which the Authority or relevant regional environmental agency

lacks the expertise.

3. AIDS TO ASSIST THE REVIEW PROCESS

The recommended approach to review the adequacy of information contained in
the EIS report is based on the requirements of Guideline Series 2 and Guideline
Series 3 of this review package.

1


Even though these sections of the document would have a benefit in providing
general guidance as to reviewing the adequacy of the report in terms of covering
sufficient aspects of the requirement, they are not considered exhaustive by their
own to enable the reviewers to fully evaluate a report. Thus, the reviewers are
recommended to draw extensively on their own experiences and other sources so as
to sufficiently review a report.

3.1. Checklists for Evaluating the Report

The list of indicators (Review Guideline Series 3) can be used by the reviewer as
main guide to identify environmental factors which may potentially be affected by
development activities, or which might place significant constraints on a proposed
development.

3.2. Guideline for the Contents and Scopes of the Report

The required outlines for report requirements (Review Guideline series 2) give
guidance on the structure as well as technical aspects of the reports that should be
covered. In short this guideline will have importance in providing the required
information for: -

 determining the quality and sufficiency of the report; and
 ensuring that the assessments are in an appropriate structured format that enables

the Authority or relevant regional environmental agency to make well-informed
decisions.

3.3. Site Visits

As deemed necessary, the reviewers need to undertake site visits to the project area
for the purpose of verifying the validity and reliability of the issues raised in the EIS
report of the project.

4. REGARDING ADEQUACY OF THE REPORT

4.1. Identifying Effective EIA

An effective EIA will enable the Authority or regional environmental agency to
weigh up the costs and benefits of the proposal, so as to whether or not the
project is environmentally and economically sustainable and socially acceptable.
To this effect therefore, reviewing considers the adequacy of:

 compliance with the environmental requirements (legal and procedural)
 information with regard to :

 compliance with the Terms of Reference;
 the examination of alternatives, impacts, mitigation and monitoring;

2


 the use of scientific and appropriate methodologies,
 involvement of all stakeholders;
 presentation of information to decision makers,; the public etc.

In general, effective review of EIS Report should be governed by taking into
consideration of:

 formal judicial control;
 administrative requirements;
 ethical and professional standards ;and.
 direct stakeholders involvement.

4.2. A Framework (structured Questionnaire) for Review

Some of the key issues which need due consideration during the review of EIS
report are structured around a list of questions. The coverage of the review
considerations include among other things the following:

 Have the guiding principles of Environmental Policy of Ethiopia and elements
regarding EIA been applied?

 Has a broad understanding of the term ‘environment’ contained in the
Proclamation on the Establishment of Environmental Proclamation Organs
and EIA proclamation been adopted in the planning and assessment?

 Has the EIA procedure been followed in preparing environmental impact
study report of the project?

 Has there been sufficient consultation with relevant stakeholders at the
federal, regional and local levels?

 Is it clear whether predictions or judgments were based on expert opinion,
standards, models, case studies or personal experience and judgments?

 Does the EIA report provide the necessary information as per the guideline for
the content and scope requirement of the report ?

 Is the report organized in a systematic and integrated manner so as to clearly
show the interrelationships between sections? Is the information in the report
accurate, unbiased and credible?

 Is adequate attention given to the reasonable alternatives identified during the
scoping stage?

 Does the report consider the possibility of cumulative impacts?
 Are mitigating measures defined in specific and practical terms?
 Is Environmental Management Plan (EMP) containing environmental impacts,

mitigating measures, costs, etc.described?
 Is the information analyzed, synthesized and integrated so as to indicate the

main issues to be evaluated?
 Does the report contain a conclusion (should necessarily be reflected in the

Executive Summary), which indicates the main issues to be evaluated in the
decision?

3


 Are the judgments made around the issue of significance valid? Is it clear how
they were made?

 Is the information in the report presented so as to make sure that it is
accessible and clearly communicated to the non-specialists?

 Have appendices containing detailed technical reports, approved minutes of
public involvement process and others attached to the report?

4.3 Format for Compiling the Review Comments

The review is suggested to be carried out by experts who are familiar with the EIA
process and other environmental requirements of the country. The reviewers are
recommended to give their comments based on the Review Criteria (see Guideline
series 4). This format would have importance in evaluating the reports in a systematic
and objective manner. These review criteria are an amalgamation and extension of Lee
and Colley's and EC's criteria, developed by the Impact Assessment unit (IAU) at oxford
Brookes University.

4


REVIEW GUIDELINE SERIES

Guidelines for Contents and
Scopes of Report


Table of Contents

page

1. INTRODUCTION.......................................................................................................1

2. STRUCTURE AND CONTENT OF THE REPORT................................................1

2.1. Executive Summary..................................................................................................1

2.2. Introduction..............................................................................................................2

2.4 Approach to the Study................................................................................................2

2.5 Assumptions and /or Gap in Knowledges..................................................................2

2.5 Administrative, Legal and Policy requirements......................................................3

2.6. Assessment.............................................................................................................3
2.6.1. Baseline Information On the Project Proposal..................................................3
2.6.2 Baseline Information – Biophysical Environment/ Human Environment..........4
2.6.3. Synthesis and Analysis of Information to the Environmental Impacts of a
Project..........................................................................................................................4

2.7. Mitigation Measures..............................................................................................5
2.7.1. Environmental Management Plan...................................................................5
2.7.2. Monitoring / Auditing.......................................................................................5

2.8. Conclusions and Recommendations......................................................................6

2.9. Appendices.............................................................................................................6


1. INTRODUCTION


This section is intended to provide information about the contents of the EIA report.
The focus of this guidelines is to support informed decision making by enabling the
reviewers to make quick and detailed evaluation of EIS report.

2. STRUCTURE AND CONTENT OF THE REPORT


The following summary is a quick-reference guide that should be incorporated in the
Environmental Impact Study report.

1. Executive Summary;
2. Introduction;
3. Approach to the study;
4. Assumptions and/or Gap in know ledges;
5. Administrative, Legal and Policy requirements;
6. Assessment;
7. Mitigation measures;
8. Conclusions and Recommendations;
9. Appendices.

The contents of each section are described as follows.

2.1. Executive Summary

This section is an important part of the report that enables the reviewers to have a
very clear view of the intended project. To this effect therefore, the summary should
provide brief, accurate, clear, and concise information about the project, in particular
highlighting the main findings and recommendations that are relevant for decision-
making. As a general guide this section needs to contain:

 title and location of the project;
 name of the proponent;
 name of the consultants and/or organization preparing the EIS report;
 a brief project description;
 project alternatives;
 the major impacts;
 recommendations for mitigation/ compensation;
 proposed monitoring activity, and implementation strategy.

1


2.2. Introduction

This section will have importance in providing background information about
the proposal and indicating how the report is structured. This needs to be
outlined in one or two pages. It is important that the ‘context’ of the study
report should make clear especially the following: -

 Background information that can be used for the project proposal or the
study in context;

 An outline of the proposal (e.g. objectives, location; proposed alternatives
in terms of location, design, process, input, etc, input and resource
requirement, life-span of development);

 The structure of the report concerning the location of the TOR, summary,
conclusions and recommendations;

 Methodologies employed. By how many specialists and which
disciplines.

2.4 Approach to the study

The methodologies to be used for identifying, predicting and evaluating of the
impacts (both positive and negative), alternatives, mitigating measures and
public participation are required to be described. In describing this aspect the
following points should be clearly stipulated:

 Objectives of the assessment;
 Approaches employed for assessment and evaluation (e.g. based on

professional opinion or involving some techniques such as cost benefit
analysis, personal experience, checklist, overlay);

 Description of the approach and/or methodology in involving the relevant
stakeholders effectively;

 Explanation as to how the study team is constituted to undertake the study.

2.5 Assumptions and /or Gap in Knowledges

Reliability and quality of data to be collected with regard to the proposed
project from different sources may involve some degrees of uncertainties due
to absence of sufficient information. As a consequence of this, some of the
assessment may be based on assumptions or there may be gaps and
uncertainties in impact prediction and evaluation. In this regard therefore, the
study preparer is required to clearly state the level of assessment by
considering the following.

2


 Identification of knowledge gaps, assumptions and unavailable
information;

 Reasons for the incomplete nature and/or assumptions of information;
 The implications of those identified knowledge gap and assumptions for

decision making;
 Proposals and/or suggestions to avoid the identified constraints and

limitations.

2.5 Administrative, Legal and Policy requirements

This will have a benefit in giving an overall picture (idea) as to how the proposed
project fit into such broader frameworks. This section should contain the following
information:

 Identification of planning and administrative procedures followed and the
relevant legislations;

 Indication of how compliance has been achieved with respect to other
environmental requirement provisions;

 Inclusion of relevant section of the legislation as an Appendix.

2.6. Assessment

One of the objectives of EIA is to integrate environmental considerations at the
earliest phase of the project cycle so as to select the best project alternative that is
socially acceptable and environmentally sound and sustainable.

In order to achieve the above objective therefore, the required assessments in this
section should be carried out for each of the alternatives. This will have
importance in facilitating comparison between them.

The statements for the baseline and impact assessments need to be interms of
specificities, not generalities. It is to be noted that they are required to be
prepared at a level of accuracy and specificity consistent with a feasibility study
of the project.

2.6.1. BASELINE INFORMATION ON THE PROJECT PROPOSAL


In the description of the project proposal the following elements are required to be
covered:

 Size and nature of development;
 Brief description of project alternatives;
 Sources, types, characteristics, and volume of raw materials;
 Time schedule for phasing of development (i.e. construction, operation,

maintenance, decommissioning),
 Description of technological process;

3


 Output volume (byproducts and products of the raw materials);
 Removal and disposal of waste;
 Human and Resource Materials costs.

2.6.2 BASELINE INFORMATION – BIOPHYSICAL ENVIRONMENT/ HUMAN
ENVIRONMENT

Acquisition of baseline information as to the actual site of the project and the
description of the state of the environment are required. This section will give more
emphasis on brief description of the environment that will be affected by the
development. The elements to be included in this section are the following:

 Area specific information about the location of the project (e.g. land
tenure, surrounding land uses, physical constraints, infrastructure services
in and around the project),

 Boundaries of the project and its implication on the environment,
 Qualitative and quantitative biophysical environment data (e.g. climate,

soil, geology, hydrology, topography, flora and fauna),
 Qualitative and quantitative socio-economic data (e.g. demographic

indices, standard of living, infrastructure services, housing, energy and
water supply),

 Cultural and historic environment (e.g. sites of national parks, sanctuaries,
monuments, statues, religious significant areas),

 Location map, figures, tables and other illustrative information,
 Description of both the local and regional biophysical and human

environment of a project when it is likely produces trans-regional
impacts.

2.6.3. SYNTHESIS AND ANALYSIS OF INFORMATION TO THE
ENVIRONMENTAL IMPACTS OF A PROJECT

This is an important and crucial section that will have importance in identifying,
predicting and evaluation of impacts (both negative and positive). With regard to
each impact, the following elements (points) should be included.

 Criteria used for determining significance of impact (e.g. magnitude,
geographic extent, duration, frequency, reversible or irreversible, risk of
uncertainty, size of group affected);

 Brief description and analysis of each impact (e.g. nature, significance,
and extent);

 Affected stakeholders in and around the project area;
 A comparison of proposal options (such as size, siting, technology;

layout, energy sources, source of raw materials) within existing
economic, technical, environmental and social constraints;

4


 Impacts on the environment which results from the incremental impact
of the proposed project when added to other past, current and reasonably
foreseeable future proposals;

 Potential accident or hazard scenarios covered in the assessment;
 Degree of confidence in prediction;
 Weighing (judging) the collected information for selecting the best

alternatives.

2.7. Mitigation Measures

The focus of this section will have importance in suggesting appropriate measures
in order to avoid and/or minimize negative impacts and optimize the positive
ones. Characteristics of the mitigating measures should be project specific and
will take account of various issues such as cost, views of stakeholders involved in
the EIA process (including consultation within government and the community)
and practicality. The main types of mitigating measures which need due
considerations are the following.

 Preventing, reducing or minimizing impacts before they occur;
 Eliminating an actual impact over time by incorporating appropriate

maintenance measures during the life of the project;
 Rectifying an impact by repairing, rehabilitating or restoring the affected

environment;
 Compensating for an impact by replacing or providing substitute

resources or environments as well as contingency plans in case of
emergencies;

 Maximizing beneficial impacts through specific additional actions.

2.7.1. ENVIRONMENTAL MANAGEMENT PLAN

The effective implementation of EIA findings and recommendations hinges
largely on the production of a focused EMP. It should include at least the
following information:

 Description of the proposed mitigation measures;
 Schedule for implementation of mitigation measures
 Proposed reporting and review procedures;
 Cost estimate of mitigating measures;
 Capacity building requirement in terms of human and material resources;
 Stakeholders (parties), which are responsible for implementing mitigation

measures.

2.7.2. MONITORING / AUDITING

Some impacts may need ongoing monitoring during construction and operation
phases of the project. This helps ensure effective implementation of mitigation

5


measures and verify the accuracy of prediction. To this effect therefore, this
section is used to clarify the following aspects.

 A check that a proposal is in compliance with environmental
requirements;

 Periodical monitoring and analysis of selected environmental parameters
and production and submission of reports for the concerned
environmental agency;

 Checks that mitigation measures are being implemented during
construction and operation phases;

 Appraisal of mitigation measures.

2.8. Conclusions and Recommendations

This section is important to highlight key issues, which are relevant to decision
making. Especially the main reasons for selecting the recommended alternative
need to be clearly stipulated.

Besides, the strategies to be employed for compensating unavoidable adverse
impacts as well as reducing the associated risks of the project proposal should be
provided in outline form. This information can easily be extracted from the EMP
prepared for the project proposal. This section hence is required to include:

 Brief discussion of key issues;
 Statement of adverse impacts and the suggested measures to compensate

them;
 Identification of management and monitoring needs;
 Additional recommendations;
 Net benefits, which justify the project by indicating of both positive and

negative impacts;
 Explanation of how adverse effects have been mitigated;
 Explanation of use or destruction of any irreplaceable components;
 Provisions for follow-up surveillance and monitoring.

2.9. Appendices

These are separate documents to be used as references for the reviewers. They
enable reviewers to reach at appropriate decision making. Examples of
documents that may be provided as appendices are:

 A glossary;
 An explanation of acronyms;
 Terms of Reference;
 Endorsement letter from the concerned relevant environmental agency or

local administration;
 Safety or product quality certificate;
 Health and product quality assurance certificates as the case may be;

6


 flow charts and site maps;
 brief corporate environmental policy;
 detailed technical reports;
 approved minutes of public involvement process;
 List of Members of the Study Team (names, qualifications, etc.).

7


REVIEWGUIDELINE SERIES

Checklist of Environmental
Characteristics


Table of Contents
page

1. INTRODUCTION......................................................................................................1

2. SOCIO-ECONOMIC ASPECTS..............................................................................1

2.1 Demographic Features of the Area........................................................................1

2.2 Sociological and Cultural Aspects...........................................................................2

2.3 Economic And Employment Status of the Project Area..........................................2

2.4 Settlement and Resettlement Patterns.....................................................................2

2.5 Institutions and Services in relation to the Development Project..........................2

2.6 Public Participation................................................................................................2

2.7 Health Aspects.......................................................................................................3

3. ECOLOGICAL ASPECTS OF THE PROJECT AREA AND ITS VICINITES.3

3.1 Vegetation................................................................................................................3

3.2 Domestic and Wild Animals (Fauna)......................................................................4

3.3 Natural and Semi natural Communities.................................................................4

4. SOCIO-CULTURAL ASPECT...................................................................................5

5. PHYSICAL ASPECTS OF THE PROJECT AREA................................................5

5.1. Land........................................................................................................................5

5.2. Water body...............................................................................................................5

5.3. Climate.....................................................................................................................6

6. LAND USE AND LAND SCAPE CHARACTER....................................................6

7. INFRASTUCTURE SERVICES................................................................................6

7.1. Energy Supply.........................................................................................................6

7.2. Water supply...........................................................................................................7

7.3. Waste Management................................................................................................7

7.4. Housing and Road Facilities.................................................................................7

7.5. Health Service Facilities........................................................................................7

1


8. THE NATURE AND LEVEL OF PRESENT AND FUTURE
ENVIRONMENTAL POLLUTION................................................................................7

8.1. Air Pollution...........................................................................................................7

8.2. Water Pollution.......................................................................................................8

8.3. Noise, Vibration and Lighting................................................................................8

8.4. Visual Pollution......................................................................................................8

8.5. Solid or Liquid Waste and Byproduct Disposal......................................................8

9. HEALTH AND SAFETY.............................................................................................9

2


1. INTRODUCTION

This checklist will have importance in suggesting a range of technical issues and
sub issues that should be considered in evaluating (reviewing) of different
development projects in any sector. Except with few modifications the structure
and issues of the checklist are adopted from the checklist of Environmental
characteristics prepared by the CSIR (Republic of South Africa.)

This checklist can be used by the reviewers to identify environmental factors which
may potentially be affected by development activities, or which might place
significant constraints on a proposed development.

It should be noted that the checklist is not a static document. It is subject to critical
review and revision with changing ideas on best practice through regular updating.
Moreover, it should be recognized that the environmental aspects listed in the
checklist are not exhaustive and the user (reviewer) should be aware that other
characteristics, significant to a particular situation, may occur. He/she should thus
employ the checklist in a manner that can best suite to address them.

2. SOCIO-ECONOMIC ASPECTS


Could the proposed development have possible impact (positive and /or negative)
on, or be constrained by, any of the following?

2.1 Demographic Features of the Area.

 Population size, composition and structure

 Total number of inhabitants
 Sex and age structure
 Literacy rate
 Growth rate of the local population

 Location, distribution or density of the population and its implication on:

 Existing land use pressure
 Anticipated land use pressure

 Existing / anticipated migration

 Emigration and immigration pattern
 Labour movement

1


2.2 Sociological and Cultural Aspects

 Means of livelihood and lifestyles
 Values, customs and traditions of the local people
 Religions of the local population
 Cultural or lifestyle diversity
 Major clans/tribes and their interaction

2.3 Economic And Employment Status of the Project Area

 Economic base of the area
 Employment level and scale of employment growth
 Conflict, which may arise as the result of non-local labor moving into the

area
 Non-local labor remaining in the area after completion of the development
 Pressure on land use
 Job opportunities for local people
 Employment level of the local people based on age range and gender

structure

2.4 Settlement and Resettlement Patterns

 Current settlement pattern (e.g. nucleated, scattered, etc.)
 Township
 Expected displacement, if any
 Displacement of the people and its implication on their attitude
 Compensation mechanisms

2.5 Institutions and Services in relation to the Development Project

 Local traditional institutions and their attitude towards change and
development

 Adequacy of the infrastructure services
 Quality of life with respect to infrastructure services (eg. education,

health, etc.)

2.6 Public Participation

 ways of maximizing the local people’s participation
 involvement of women in the development project
 Provision of employment for outsiders.

2


2.7 Health Aspects

 General health status of the population based on health indicators such
as prevalence and incidence of major diseases of concern

 Major health problems that may arise as the result of the development
(e.g. water and vector borne diseases, occupational health diseases,
communicable diseases especially HIV/AIDS, etc.).

 Threats to health from pollution
 Dust related illness (e.g. silicosis)
 Accidents resulting from development projects (e.g. suffocation due to

mine collapse)
 Environmental factors/variables (e.g. demographic, climate, sanitation

and water supply, fauna and flora, socio-cultural, etc.) which
contributes for the introduction and/or aggravation of diseases

 Impacts of the Project on the health and creation of favorable
environment situation for the propagation of diseases

3. ECOLOGICAL ASPECTS OF THE PROJECT AREA AND ITS
VICINITES

Could the proposed development has possible significant impact (positive
and/or negative) on, or be constrained by, any of the following?

3.1 Vegetation

 The type and extent of each major type of vegetation (forest, woodlands,
etc.)

 Diversity of plant communities
 Plant types which are on the verge of extinction (e.g. endangered plant

species)
 Survival of rare plant species
 Forest including cutting of forests for the purpose of getting fuel wood,

construction of houses and roads, expansion of agricultural area, creation
of water harvesting areas such as reservoir and ponds and other uses

 Vegetation communities reserved for conservation or scientific importance
 Vegetation types of particular recreational value
 The economic value through exploitation of vegetation for different

purposes (e.g. for fuel wood, construction wood including poles, animal
feed, and for rubber, gum and medicinal value)

 The introduction or spread of invasive alien seeds and plants
 Natural replenishment of existing species
 Genetically engineered (modified) organisms

3


3.2 Domestic and Wild Animals (Fauna)

 Animal species diversity
 The rare and endangered ones, in particular the currently exploited species
 The existing fauna (including birds) in relation to their breeding, feeding

area and mobility
 Animal communities of particular scientific, recreational, educational and

conservational value (eg. special habitats for wild animals such as national
parks, sanctuaries, controlled hunting area and reserves)

 Natural migration of species
 Entertainment and impingement of aquatic organisms
 The aquatic life and nutrient levels such as nutrient cycling in the

catchment, reservoir, command, and downstream areas.
 The pattern of relationship that exists between animals and their

environment (plant, human, etc.)
 Invasive and alien species
 Survival of animal communities resulting from induced development

activities and associated phenomena
 Genetically modified organisms


3.3 Environmental Sensitive Areas

 On conservation strategy envisaged and/or to be envisaged for both flora
and fauna (e.g. afforestation programme, alternative energy resources,
protected area)

 established conservation area (e.g. parks, sanctuaries, game reserves,
controlled hunting areas etc.)

 local, regional or national importance of the natural communities (e.g.
economic, scientific, conservational, educational)

 conformity of the development activities with the existing natural
communities.

 ecological functioning of the natural ecosystems resulting from:

 physical destruction of the habitat
 reduction in the effective size of the delineated sensitive areas
 quality and flow of ground water
 quality of stable (standing) or flowing water
 oxygen content of the water
 salinity
 turbidity
 flow rate
 temperature
 level of chemical and other forms of pollution
 eutrophication
 toxins such as effluents or poisons

4


 siltation
 air quality
 levels of dust pollution and deposition
 availability of food
 the construction of access routes, roads and path ways
 recreation pressure
 secondary or cumulative impacts
 presence or introduction of invasive alien species
 rehabilitation potential
 barriers to animal movement or migration

4. SOCIO-CULTURAL ASPECT

Could the proposed development has possible significant impact (positive and/or
negative) on, or be constrained by, any of the following?

 land scape value and scenic beauty of site
 sites of archeological importance
 sites of historical significance such as monuments, statues, etc.
 recreating areas like national parks, sanctuaries, etc.
 sites of cultural and religious significance

5. PHYSICAL ASPECTS OF THE PROJECT AREA

Could the proposed development has significant impact on, or be constrained by,
any of the following?

5.1. Land

 alteration in surface characteristics (e.g. rock, soil deposit)
 erodibility and chemical composition of the soil
 potential landslide risks
 unstable bedrock
 surface Subsidence
 soil degradation intensity
 physical work conservation
 suitability of soils for different purposes (e.g. for agriculture, industry,

mineral extraction)
 the availability of or access to construction materials and the management

of stockpiles, spoil materials, etc.
 unique geological and physical features

5.2. Water body

 water ionic balance and its effects on :-
 Chemical composition,
 natural succession,
 reproduction and diversity of water bodies organisms

5


 physical, biological and chemical characteristics of the receiving water
bodies

 natural flow and drainage patterns
 ground water hydrology and the water table
 the quality and quantity of surface water, ground water and public water

supply
 scarcity of water resources
 water resource use conflicts (e.g. effects on downstream users)
 threats to hydrological functioning due to pollution, turbidity, alkalinity,

water logging, salinity, impodument construction, water extraction, etc.
 important zones such as breeding ground and migratory routes
 conservational or recreational value of rivers, streams, lakes and wetlands

5.3. Climate

 microclimatic change (functions in temperature and humidity)
 dispersal or influx of pollutants
 global warming and sea level rise

6. LAND USE AND LAND SCAPE CHARACTER

Could the proposed development have a significant impact on, or be constrained by,
any of the following?

 compatibility of land uses (agriculture, industry, forestry, urban, open space,
recreational areas etc.) within the area

 aesthetic quality of the landscape
 compatibility with the scale of developments in the area
 preservation of scenic views and valued features
 revitalization of run-down areas
 land scaping plans and/or site restoration proposals

7. INFRASTUCTURE SERVICES

Could the proposed development have a significant impact on, or be constrained by,
any of the following?

7.1. Energy Supply

 wood for fuel consumption
 Biomass fuels (including cow-dungs and agri-residues)
 Planned provision of power for the area
 power generation and associated infrastructure
 availability of alternative fuel sources

7.2. Water Supply

 potable water supply

6


 adequacy and reliability of water supply
 adequacy of ground water reserves
 need for additional purification system

7.3. Waste Management

 efficiency and capacity of existing waste management facilities
 risk associated with waste transport
 risk associated with fuels and oil spills from construction equipment and

maintenance
 adequacy of emergency waste disposal facilities
 hazard to ground water pollution
 danger of rodents and scavengers at waste sites
 potential for water borne diseases
 visual and smell effects of waste sites
 hazard of birds to air traffic near sewage ponds and landfill sites

7.4. Housing and Road Facilities

 housing condition and facilities (eg. density per room, kitchen etc)
 physical availability of the road network

7.5. Health Service Facilities

 adequacy of temporary facilities during construction phase of
developments

 adequacy of facilities for primary health care
 adequacy of the existing health services to cope with increased population
 projected provision of health service facilities

8. THE NATURE AND LEVEL OF PRESENT AND FUTURE
ENVIRONMENTAL POLLUTION


Could the proposed development have a significant impact on, or be constrained by,

any of the following?

8.1. Air Pollution

 existing levels of atmospheric pollution
 the nature of air pollution (e.g. ozone depleting gases, acidic compounds

and toxic substances)
 extent of the local build-up of pollutants due to inversions
 smog formation and reduction in visibility
 production of offensive odors
 pollution of adjacent sensitive areas
 effects on human health and other living organisms
 effects on stone work, buildings, etc.

7


8.2. Water Pollution

 level of water pollution
 the concentration of pollutants due to variations of water flow
 localized pollution build-up through changes in salinity gradients and/or

current movements
 Salinization of fresh waters
 synergistic or compounding effects with existing pollutants
 production of offensive odours
 effects of treated or untreated effluent on the flora and fauna of river, lake,

etc.
 effects on irrigation schemes
 effect on recreational activities

8.3. Noise, Vibration and Lighting

 increase in ambient noise, vibration or illumination levels
 peace and quiet of residential areas
 functioning of schools, hospitals and informal recreation areas
 levels of annoyance and discomfort due to vibration caused by such

activities as blasting and pile-driving
 structural damage caused to buildings by vibration
 effects on sensitive areas (eg. wildlife of nature reserves, sites of special

scientific interest)

8.4. Visual Pollution

 existing level of visual pollution
 reduction in aesthetic quality of the environment through

 sign-boards and advertising
 unsightly or in appropriate walls, buildings, roads or other

installations

8.5. Solid or Liquid Waste and Byproduct Disposal

 existing proposed waste disposal plans
 choice of alternative means of disposal
 alternative treatment technologies
 choice of disposal sites
 biological and chemical characteristics of the leachates generated within

the disposal sites
 measures to reduce or treat leachates
 potential ground water pollution
 potential pollution of nearby surface waters
 potential health hazard to nearby residents

8


9. HEALTH AND SAFETY

Could the proposed development have a significant impact on, or be constrained by,
any of the following?

 effects in the work place resulting from:

 dust, fume and particulate matter
 noise, odors, gases, vapors, use of dangerous chemicals
 lighting, heat, colds, noise, vibration, radiation
 mine wastes and hazardous residues such as waste rock and tailings,

acid mine drainage, heavy metals and radioactive waste
 protective clothing and equipment
 access to recreational facilities
 risk of workplace accidents
 availability of services such as factory based health services, canteens,

change-rooms

 effects in the surrounding areas resulting from:

 dust, fumes, particulate matter, noise
 vibration, radiation, odours, gaseous emissions
 vapours, use of dangerous chemicals, lighting
 mine wastes and hazardous residues such as waste rock and tailings,

acid mine drainage heavy metals and radioactive waste
 risk of major disasters involving explosions or major leaks of toxic

liquids or gases
 solid waste disposal techniques
 liquid waste effluent and disposal

9


REVIEW GUIDELINE SERIES


REVIEW CRITERIA


Back ground

The proposed tables in the following consecutive pages are in the form of a hierarchical
review framework concerning eight sub-headings, each with a series of list of issues as
specified in Guideline series 1 and Guideline Series 2.

 Description of development
 Description of the Environment
 Scoping, consultation, and Impact Identification
 Prediction and Evaluation of Impacts
 Alternatives
 Mitigating and Monitoring
 Non-technical Summary
 Organization and presentation of Information

As pointed out by UNEP and EEU (1996) the contents of the evaluation (review) should
also be extended to recommend the following:

 a brief summary of strengths and weakness of the report
 any needs for further study
 any impact monitoring and management requirements
 any terms and conditions that should apply if approval of the proposal is

granted.

In this regard therefore, inorder to determine the validity and accuracy of information
contained in the EIS report and advise on whether a project should be allowed to proceed,
the reviewers are recommended to use this adopted environmental criteria.

As retreated from the cross refered material it is unlikely that any EIS report will fulfill
all the criteria. Similarly, some criteria listed in the tables may not apply to all projects.
In view of this therefore, the reviewers are expected to judge the information based on the
relevance to the project context and importance of decision-making as well as
presence/absence in the report.

As per the instruction mentioned in the Reference Material, for each review subh-eading
(category) indicated above, the reviewer is asked to rate the EIS report for its
performance in addressing a list of issues. The reviewer gives each issue a rating
between A and F (see marking criteria at the top of the table) next page. The overall
rating for a category is determined by the reviewer on the basis of the results of the
individual ratings, weighted according to their relative importance by the reviewer.

1


EIS REVIEW CRITERIA

EIS title, date and number:
Project name:
reviewer name:
marking criteria

(A-F) to summarise how well EIS fulfils creation for all criteria
A- good
B- Generally satisfactory (minor omissions etc.)
C- just satisfactory (despite omissions)
D- just unsatisfactory (because of omissions etc.)
E- not satisfactory (significant omissions etc.)
F- poor

1. DESCRIPTION OF THE DEVELOPMENT

Criterion Performance
against criteria

Comments

Principal features of the project
1.1. Explains the purpose (s) and objectives
of the development.
1.2. Indicates the nature and status of the

decision(s) for which the environmental
information has been prepared.

1.3. Gives the estimated duration of the
construction, operational and, where
appropriate, decommissioning phase, and the
programme within these phases.

1.4. Describes the proposed development,
including its design and size or scale.
Diagrams, plans or maps will usually be
necessary for this purpose.

1.5. Indicates the physical presence or appearance
of the completed development within the
receiving environment.

1.6. Describes the methods of construction.
1.7. Describes the nature and methods of

production or other types of activity
involved in the operation of the project.

1.8. Describes any additional services (water,
electricity, emergency services etc.) and
developments required as a consequence of
the project.

2


Criterion Performance
against criteria

Comments

1.9. Describes the project's potential for accidents,
hazards and emergencies.

Land requirements
1.10 Defines the land area taken up by the

development site and any associated
arrangements, auxiliary facilities and
landscaping areas and by the construction
site(s), and shows their location clearly on a
map for a linear project, describes the land
corridor, vertical and horizontal alignment
and need for tunneling and earthworks.

1.11 Describes the uses to which this land will be
put, and demarcates the different land use
areas.

1.12 Describes the reinstement and after-use of
landtake during construction

Project Inputs
1.13 Describes the nature and quantities of

materials needed during the construction and
operational phases.

1.14. Estimates the number of workers and
visitors entering the project site during
both construction and operation.

1.15. Describes their access to the site and likely
means of transport.

1.16 Indicates the means of transporting
materials and products to and from the site
during construction and operation, and the
number of movements involved.

Residues and emissions
1.17 Estimates the types and quantities of waste

matter, energy (noise, vibration, light,
heat, radiation etc.) and residual materials
generated during construction and
operation of the project, and rate at which
these will be produced.

1.18 Indicates how these wastes and residual
materials are expected to be
handled/treated prior to release/disposal,
and the routes by which they will
eventually be disposed of to the
environment.

3


Criterion Performance
against criteria

Comments

1.19 Identifies any special or hazardous wastes (
defined as...) which will be produced, and
describes the methods for their disposal as
regards their likely main environmental
impacts.

1.20 Indicates the methods by which the
quantities of residuals and wastes were
estimated. Acknowledges any uncertainty,
and gives ranges or confidence limits
where appropriate.

Overall mark:

2. DESCRIPTION OF THE ENVIRONMENT
Criterion Performance

against criteria
Comments

Description of the area occupied by and
surrounding the project
2.1 Indicates the area expected to be significantly

affected by the various aspects of the project
with the aid of suitable maps. Explains the
time over which these impacts are likely to
occur.

2.2 Describes the land uses on the site(s) and in
surrounding areas.

2.3 Defines the affected environment broadly
enough to include any potentially significant
effects occurring away from the immediate
areas of construction and operation. These
may be caused by, for example, the
dispersion of pollutants, infrastuctural
requirements of the project, traffic etc.

Baseline conditions
2.4 Identifies and describes the components of the

affected environment potentially affected by
the project.

2.5. The methods used to investigate the affected
environment are appropriate to the size and
complexity of the assessment task.
Uncertainty is indicated.

2.6. Predicts the likely future environmental
conditions in the absence of the project.
Identifies variability in natural systems and
human use.

Criterion Performance Comments

4


against criteria
2.7. Uses existing technical data sources,

including records and studies carried out for
environmental agencies and for special
interest groups.

2.8. Reviews local, regional and national plans
and policies, and other data collected as
necessary to predict future environmental
conditions. Where the proposal does not
conform to these plans and policies, the
departure is justified.

2.9 Local regional and national agencies holding
information on baseline environmental
conditions have been approached.

Overall mark:

3. SCOPING, CONSULTATION, AND IMPACT IDENTIFICATION

3.1. There has been a genuine attempt to contact
the general public, relevant public agencies,
relevant experts and special interest groups
to appraise them of the project and its
implication. Lists the groups approached.

3.2 Statutory consultees have been contacted.
Lists the consultees approached.

3.3 Identifies valued environmental attributes on
the basis of this consultation.

3.4. Identifies all project activities with
significant impacts on valued environmental
attributes. Identifies and selects key impacts
for more intense investigation. Describes and
justifies the scoping methods used.

3.5. Includes a copy or summary of the main
comments from consultees and the public,
and measures taken to respond to these
comments.

Impact identification
3.6. Considers direct and indirect/secondary

effects of constructing, operating and, where
relevant, after-use of decommissioning of
the project (including positive and negative
effects). Considers whether effects will arise
as a result of "consequential" development.

Criterion Performance Comments

5


against criteria
3.7. Investigates the above types of impacts in so

far as they affect: human beings, flora,
fauna, soil, water, air; climate, landscape,
interactions between the above, material
assets, cultural heritage.

3.8. Also noise, land use, historic heritage,
communities.

3.9. If any of the above are not of concern in
relation to the specific project and its
location, this is clearly stated.

3.10 Identifies impacts using a systematic
methodology such as project specific
checklists, matrices, panels of experts,
extensive consultations, etc. Describes the
methods/approaches used and the rationale
for using them.

3.11 The investigation of each type of impact is
appropriate to its importance for the
decision, avoiding unnecessary information
and concentrating on the key issues.

3.12 Considers impacts which may not
themselves be significant but which may
contribute incrementally to a significant
effect.

3.13 considers impacts which might arise from
non-standard operating conditions, accidents
and emergencies.

314 If the nature of the project is such that
accidents are possible which might cause
severe damage within the surrounding
environment, an assessment of the
probability and likely consequences of such
events is carried out and the main findings
reported.

Overall mark:

4. PREDICTION AND EVALUATION OF IMPACTS
Prediction of magnitude of impacts
4.1. Describes impacts in terms of the nature and

magnitude of the change occurring and the
nature, location, number, value, sensitivity of
the affected receptors.

Criterion Performance Comments

6


against criteria
4.2. Predicts the timescale over which the effects

will occur, so that it is clear whether impacts
are short, medium or long term, temporary or
permanent, reversible or irreversible.

4.3.Where possible, expresses impact predications
in quantitative terms. Qualitative
descriptions, where necessary, are as fully
defined as possible.

4.4 Describes the likelihood of impacts occurring,
and the level of uncertainty attached to the
results.

Methods and data
4.5 The methods used to predict the nature, size

and scale of impacts are described, and are
appropriate to the size and importance of the
projected disturbance.

4.6 The data used to estimate the size and scale
of the main impacts are sufficient for the
task, clearly described, and their sources
clearly identified. Any gaps in the data are
indicated and accounted for.

Evaluation of impact significance
4.7 Discusses the significance of effects in terms

of the impact on the local community
(including distribution of impacts) and on
the protection of environmental resources.

4.8 Discusses the available standards,
assumptions and value systems which can be
used to assess significance.

4.9 Where there are no generally accepted
standards or criteria for the evaluation of
significance, alternative approaches are
discussed and, if so, a clear distinction is
made between fact, assumption and
professional judgment.

4.10 Discusses the significance of effects taking
into account the appropriate national and
international standards or norms, where
these are available. Otherwise the
magnitude, location and duration of the
effects are discussed in conjunction with the
value, sensitivity and rarity of the resource.

Criterion Performance Comments

7


against criteria
4.11 Differentiates project-generated impacts

from other changes resulting from non-
project activities and variables.

4.12 Includes a clear indication of which impacts
may be significant and which may not.

Overall mark:

5. ALTERNATIVES
Criterion Performance

against criteria
Comments

5.1 Considers the "no action" alternative,
alternative processes, scales, layouts, designs
and operating conditions where available at
an early stage of project planning, and
investigates their main environmental
advantages and disadvantages.

5.2. If unexpectedly severe adverse impacts are
identified during the course of the
investigation, which are difficult to mitigate,
alternatives rejected in the earlier planning
phases are re-appraised.

5.3. Gives the reasons for selecting the proposed
project, and the part environmental factors
played in the selection.

5.4 The alternatives are realistic and genuine.
5.5 Compare the alternatives' main environmental

impacts clearly and objectively with those of
the proposed project and with the likely
future environmental conditions without the
project.

Overall mark:

6. MITIGATION AND MONITORING

Criterion Performance
against criteria

Comments

Description of mitigation measure
6.1 Consider the mitigation of all significant

negative impacts and, where feasible,
proposes specific mitigation measures to
address each impact.

Criterion Performance Comments

8


against criteria
6.2. Mitigation measures considered include

modification of project design, construction
and operation, the replacement of facilities/
resources, and the creation of new
resources, as well as end of pipe
technologies for pollution control.

6.3 Describes the reasons for choosing the
particular type of mitigation, and the other
options available.

6.4 Explains the extent to which the mitigation
methods will be effective. Where the
effectiveness is uncertain, or where mitigation
may not work, this is made clear and data are
introduced to justify the acceptance of these
assumptions.

6.5 Indicates the significance of any residual or
unmitigated impacts remaining after
mitigation, and justifies why these impacts
should not be mitigated.

Commitment to mitigation and monitoring
6.6 Gives details of how the mitigation measures

will be implemented and function over the
time span for which they are necessary.

6.7 Proposes monitoring arrangements for all
significant impacts, especially where
uncertainty exists, to check the environmental
impact resulting from the implementation of
the project and their conformity with the
predictions made.

6.8 The scale of any proposed monitoring
arrangements corresponds to the potential
scale and significance of deviations from
expected impacts.

Environmental effects of mitigation
6.9 Investigates and describes any adverse

environmental effects of mitigation measures.
6.10 Considers the potential for conflict between

the benefits of mitigation measures and their
adverse impacts.

Overall mark:

7. NON-TECHNICAL SUMMARY

9


Criterion Performance
against criteria

Comments

Non-technical summary
7.1 There is a non-technical summary of the main

findings of the study, which contains at least a
brief description of the project and the
environment, an account of the main
mitigation measures to be undertaken by the
developer, and a description of any remaining
or residual impacts.

7.2 The summary avoids technical terms, lists of
data and detailed explanations of scientific
reasoning.

7.3 The summary presents the main findings of the
assessment and covers all the main issuers
raised in the information.

7.4 The summary includes a brief explanation of
the overall approach to the assessment.

7.5 the summary indicates the confidence which
can be placed in the results

Overall mark:

8. ORGANISATION AND PRESENTATION OF INFORMATION

Criterion Performance
against criteria

Comments

Organization of the information
8.1 Logically arranges the information in sections.
8.2 Identifies the location of information in a table

or list of contents.
8.3 There are chapter or section summaries

outlining the main findings of each phase of
the investigation

8.4 When information from external sources has
been introduced, a full reference to the source
is included.

Presentation of information
8.5 Mentions the relevant EIA legislation, name of

organization preparing the EIS, and name of
the redeveloper, name of competent authority
(ies), name address and contact number of a
contact person.

Criterion Performance Comments

10


against criteria
8.6 Includes an introduction briefly describing the

project, the aims of the assessment, and the
methods used.

8.7 The statement is presented as an integrated
whole. Data presented in appendices are fully
discussed in the main body of the text.

8.8 Offered information and analysis to support all
conclusions drawn

8.9 Presents information so as to be
comprehensible to the non specialist. Uses
maps, tables, graphical material and other
devices as appropriate. Avoids unnecessarily
technical or obscure language.

8.10 Discusses all the important data and results in
an integrated fashion.

8.11 Avoids superfluous information (i.e.
information not needed for the decision).

8.12 Presents the information in a concise form
with a consistent terminology and logical
links between different sections.

8.13 Gives prominence and emphasis to severe
adverse impacts, substantial environmental
benefits, and controversial issues.

8.14 Defines technical terms, acronyms and
initials.

8.15 The information is objective, and does not
lobby for any particular point of view.
Adverse impacts are not disguised by
euphemisms or platitudes.

Difficulties compiling the information
8.16 Indicates any gaps in the required data and

explains the means used to deal with them in
the assessment.

8.17 Acknowledges and explains any difficulties in
assembling or analyzing the data needed to
predict impacts, and any basis for
questioning assumptions, data or
information.

Overall mark:

COLLATION

11


1 Description of the development ---
2 Description of the environment ----
3 Scoping, consultation, and impact identification ----
4 Prediction and evaluation of impacts ----
5 Alternatives -----
6 Mitigation and monitoring ----
7 Non-technical summary -----
8 Organization and presentation of information ----

Overall mark (A-F): ----

12


REFERENCES

Africon Development Bank (African Development Fund) March 1997, Environmental
Assessment Guidelines: Energy

African Development Bank (African Development Fund) March 1997, Environmental
Assessment Guidelines: Irrigation

Africon International Consultants (July 2000), Draft Final Report of the seven proposed
projects (Nekemte-Assosa, Dembi-Gambella, Nazreth-Dodola and Shashemene-Goba,
Woreta-Woldiya, Gonder-Mereb River, Adigrat-Aid Abun, And Dera-Mechara)

Carl Bro als Transport Department in association with Dana Consult PLC Engineering
consultants (September 2001), Draft Final Environmental Impact Assessment Report
for the Assosa-Guba Road Project.

Commision of the European Communities (June 1993), Environmental Manual: Environmental
procedures and methodology governing Lome IV development Co-operation projects

Department of Environmental Affairs (Republic of South Africa, 1992), Guidelines for Review

Department of Environmental Affairs (Republic of South Africa, 1992), Checklist of
Environmental characteristics

Ethiopian Electric Power Corporation (June 1997), Impact Assessment of Tis Abay II
Hydroelectric Project


Environmental Protection Authority (July 2000), Environmental Impact Assessment

Guidelines Document

Federal Negarit Gazeta of the Federal Democratic Republic of Ethiopia (October , 2002),
Environmental protection Organs Proclamation

Dra Federal Negarit Gazeta of the Federal Democratic Republic of Ethiopia (December ,
2002), f Environmental Impact Assessment Proclamation

Golder Associates (UK) Ltd. (October 1998), Baseline Environmental Audit, Environmental
Management Plan, Rehabilitation and Conceptual closure plan for the LegaDembi Gold
Mine

John Glasson, Riki Therivel, Andrew Chadwick, (1994, 1999), Introduction to Environmental
Impact Assessment

NORAD (1991-1996), Guidelines for environmental impact assessment (EIA) of various types of
development projects

UNEP, EEU, (June 1996) Environmental Impact Assessment Training Resource Manual

Yonas Tekelemichael (December,2002), The Role, Status and Effectiveness of Environmental
Impact Assessment and Strategic Environmental Assessment in Ethiopia

13


ENVIRONMENTL PROTECTION AUTHORITY
GUIDELINE SERIES DOCUMENTS FOR REVIEWING ENVIRONMENTAL IMPACT STUDY REPORTs
1. INTRODUCTION

2. APPROCHeS TO BE FOLLOWED DURING The Review Process
2.1. Competent Authorities Review
2.2. Specialist Review

3. AIDS TO ASSIST THE review PROCESS
3.1. Checklists for Evaluating the Report
3.2. Guideline for the Contents and Scopes of the Report
3.3. Site Visits

4. REGARDING ADEQUACY OF THE REPORT
4.1. Identifying Effective EIA
4.2. A Framework (structured Questionnaire) for Review
4.3 Format for compiling the Review Comments

1. INTRODUCTION

2. STRUCTURE AND CONTENT OF THE REPORT
2.1. Executive Summary
2.2. Introduction
2.4 Approach to the study
2.5 Assumptions and /or Gap in Knowledges
2.5 Administrative, Legal and Policy requirements
2.6. Assessment
2.6.1. Baseline Information On the Project Proposal
2.6.2 Baseline Information – Biophysical Environment/ Human Environment
2.6.3. Synthesis and Analysis of Information to the Environmental Impacts of a Project

2.7. Mitigation Measures
2.7.1. Environmental Management Plan
2.7.2. Monitoring / Auditing

2.8. Conclusions and Recommendations
2.9. Appendices

ReviewGUIDELINE Series
2. SOCIO-ECONOMIC ASPECTS
2.1 Demographic features of the area.
2.2 Sociological and cultural Aspects
2.3 Economic And Employment Status of the Project Area
2.4 Settlement and resettlement patterns
2.5 Institutions and services in relation to the development project
2.6 Public participation
2.7 Health aspects

3. ECOLOGICAL ASPECTS OF THE PROJECT AREA and its vicinites
3.1 Vegetation
3.2 Domestic and wild animals (Fauna)
3.3 Environmental Sensitive Areas

4. Socio-Cultural Aspect
5. Physical Aspects Of The Project Area
5.1. Land
5.2. Water body
5.3. Climate

6. LAND USE AND LAND SCAPE CHARACTER
7. INFRASTUCTURE SERVICES
7.1. Energy supply
7.2. Water supply
7.3. Waste management
7.4. Housing and Road facilities
7.5. Health service facilities

8. THE NATURE AND LEVEL OF PRESENT AND FUTURE ENVIRONMENTAL POLLUTION
8.1. Air Pollution
8.2. Water pollution
8.3. Noise, vibration and lighting
8.4. Visual Pollution
8.5. Solid or liquid waste and byproduct disposal

9. HEALTH AND SAFETY
Back ground
References

Filename extension

pdf
Chroma_BlackIsZero:
true

Chroma_ColorSpaceType:
RGB

Chroma_NumChannels:
4

Compression_CompressionTypeName:
deflate

Compression_Lossless:
true

Compression_NumProgressiveScans:
1

Creation-Date:
2021-07-28T15:09:36Z

Data_BitsPerSample:
8 8 8 8

Data_PlanarConfiguration:
PixelInterleaved

Data_SampleFormat:
UnsignedIntegral

Dimension_HorizontalPixelSize:
0.35273367

Dimension_ImageOrientation:
Normal

Dimension_PixelAspectRatio:
1.0

Dimension_VerticalPixelSize:
0.35273367

IHDR:
width=1024, height=420, bitDepth=8, colorType=RGBAlpha, compressionMethod=deflate, filterMethod=adaptive, interlaceMethod=none

Transparency_Alpha:
nonpremultipled

access_permission_assemble_document:
true

access_permission_can_modify:
true

access_permission_can_print_degraded:
true

access_permission_can_print:
true

access_permission_extract_content:
true

access_permission_extract_for_accessibility:
true

access_permission_fill_in_form:
true

access_permission_modify_annotations:
true

created:
2021-07-28T15:09:36Z

creator:
user

dc_creator:
user

dc_format:
application/pdf; version=1.5

dc_language:
en-GB

dc_title:
Republic of Ethiopia (2003) EPA Guideline series documents for reviewing environmental impact study reports

dcterms_created:
2021-07-28T15:09:36Z

embeddedResourceType:
INLINE

file_modified_dt:
2021-07-30T15:43:04Z

height:
420

id:
https://plasticsdb.surrey.ac.uk/documents/Ethiopia/Republic of Ethiopia (2003) EPA Guideline series documents for reviewing environmental impact study reports.pdf

language:
en-GB

law_code_ssall_labels_stemming_en_ss_tag:


law_code_ssall_labels_stemming_en_ss_tag_ss_taxonomy0:
  • Corpus Juris Civilis
  • Oregon Revised Statutes


meta_author:
user

meta_creation-date:
2021-07-28T15:09:36Z

pHYs:
pixelsPerUnitXAxis=2835, pixelsPerUnitYAxis=2835, unitSpecifier=meter

path0:
plasticsdb.surrey.ac.uk

path1:
documents

path2:
Ethiopia

path_basename:
Republic of Ethiopia (2003) EPA Guideline series documents for reviewing environmental impact study reports.pdf

pdf_PDFVersion:
1.5

pdf_charsPerPage:
  • 413
  • 1862
  • 53
  • 1314
  • 1886
  • 2071
  • 2225
  • 933
  • 68
  • 1921
  • 1423
  • 1953
  • 1943
  • 2203
  • 2092
  • 1955
  • 211
  • 66
  • 2852
  • 868
  • 1647
  • 1324
  • 1943
  • 1822
  • 1498
  • 1659
  • 1658
  • 1593
  • 1067
  • 40
  • 1987
  • 1364
  • 1544
  • 1544
  • 1604
  • 1527
  • 1680
  • 1367
  • 1550
  • 1443
  • 1457
  • 457
  • 2165


pdf_docinfo_created:
2021-07-28T15:09:36Z

pdf_docinfo_creator:
user

pdf_docinfo_creator_tool:
Writer

pdf_docinfo_producer:
LibreOffice 6.4

pdf_docinfo_title:
Republic of Ethiopia (2003) EPA Guideline series documents for reviewing environmental impact study reports

pdf_encrypted:
false

pdf_hasMarkedContent:
false

pdf_hasXFA:
false

pdf_hasXMP:
  • false
  • false


pdf_unmappedUnicodeCharsPerPage:
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0
  • 0


producer:
LibreOffice 6.4

resourceName:
  • b'Republic of Ethiopia (2003) EPA Guideline series documents for reviewing environmental impact study reports.pdf'
  • image0.png


tiff_BitsPerSample:
8 8 8 8

tiff_ImageLength:
420

tiff_ImageWidth:
1024

width:
1024

xmpTPg_NPages:
43

xmp_CreatorTool:
Writer

etl_file_b:
1

etl_enhance_mapping_id_time_millis_i:
0

etl_enhance_mapping_id_b:
1

etl_filter_blacklist_time_millis_i:
0

etl_filter_blacklist_b:
1

etl_filter_file_not_modified_time_millis_i:
11

etl_filter_file_not_modified_b:
1

etl_enhance_file_mtime_time_millis_i:
0

etl_enhance_file_mtime_b:
1

etl_enhance_path_time_millis_i:
0

etl_enhance_path_b:
1

etl_enhance_entity_linking_time_millis_i:
254

etl_enhance_entity_linking_b:
1

etl_enhance_multilingual_time_millis_i:
3

etl_enhance_multilingual_b:
1

etl_export_solr_time_millis_i:
2

etl_export_solr_b:
1

etl_export_queue_files_time_millis_i:
0

etl_export_queue_files_b:
1

etl_time_millis_i:
1659

etl_enhance_extract_text_tika_server_ocr_enabled_b:
1

etl_count_images_yet_no_ocr_i:
0

X-Parsed-By:
  • org.apache.tika.parser.DefaultParser
  • org.apache.tika.parser.pdf.PDFParser
  • [org.apache.tika.parser.DefaultParser, org.apache.tika.parser.ocr.TesseractOCRParser, org.apache.tika.parser.image.ImageParser]


etl_enhance_extract_text_tika_server_time_millis_i:
1000

etl_enhance_extract_text_tika_server_b:
1

etl_enhance_pdf_ocr_time_millis_i:
14

etl_enhance_pdf_ocr_b:
1

etl_enhance_detect_language_tika_server_time_millis_i:
56

etl_enhance_detect_language_tika_server_b:
1

etl_enhance_contenttype_group_time_millis_i:
1

etl_enhance_contenttype_group_b:
1

etl_enhance_pst_time_millis_i:
1

etl_enhance_pst_b:
1

etl_enhance_csv_time_millis_i:
0

etl_enhance_csv_b:
1

etl_enhance_extract_hashtags_time_millis_i:
12

etl_enhance_extract_hashtags_b:
1

etl_enhance_warc_time_millis_i:
14

etl_enhance_warc_b:
1

etl_enhance_zip_time_millis_i:
1

etl_enhance_zip_b:
1

etl_clean_title_time_millis_i:
0

etl_clean_title_b:
1

etl_enhance_rdf_annotations_by_http_request_time_millis_i:
54

etl_enhance_rdf_annotations_by_http_request_b:
1

etl_enhance_rdf_time_millis_i:
0

etl_enhance_rdf_b:
1

etl_enhance_regex_time_millis_i:
30

etl_enhance_regex_b:
1

etl_enhance_extract_email_time_millis_i:
45

etl_enhance_extract_email_b:
1

etl_enhance_extract_phone_time_millis_i:
30

etl_enhance_extract_phone_b:
1

etl_enhance_extract_law_time_millis_i:
29

etl_enhance_extract_law_b:
1

etl_export_neo4j_time_millis_i:
94

etl_export_neo4j_b:
1

X-TIKA_content_handler:
ToTextContentHandler

X-TIKA_embedded_depth:
  • 0
  • 1


X-TIKA_parse_time_millis:
  • 977
  • 90


X-TIKA_embedded_resource_path:
/image0.png




Searching ...